Initiate failback with controlled transition
- Last Updated: February 11, 2026
- 2 minute read
- OpenEdge
- Version 13.0
- Documentation
Use the following procedure to initiate the failback process using controlled transition:
At this point the roles that both databases had during secondary replication have been reversed:
- The primary database is again the production database.
- The secondary database is again the target.
Primary replication is again being performed as it was before the initial failure occurred. The Replication server is replicating all primary transactions to the secondary database, as shown in the following figure.


