LoadMaster LM-XHC20-NG (APAC only)
- Last Updated: March 11, 2025
- 1 minute read
- LoadMaster
- LoadMaster GA
- Documentation
Note: The LoadMaster LM-XHC20-NG hardware is only
available in the Asia-Pacific (APAC) region.
Port Location - Front Panel
| Item No. | Item | Description | Notes |
|---|---|---|---|
| 1. | RAID (Dual HDD) | RAID 0 (mirroring) Hot-Swap Disk (x2) | Disk mirroring - replicating of data to two or more disks |
| HDD LED - Green | Indicates HDD operating normal | ||
| HDD LED - Red | Indicates possible HDD issue (contact Progress Kemp Customer Support) | ||
| Rebuild LED - Blinking amber | Indicates HDD rebuilding process (could take several hours to complete) | ||
| 2. | ERR LED | Error LED - off | Indicates that the Power Supply Unit (PSU) status is normal |
| Error LED - red (blinking) | Indicates PSU failure - either one or both (contact Progress Kemp Customer Support) | ||
| STBY LED | Standby LED - Amber | Indicates always-on | |
| HDD LED | LED - Green (blinking) | Indicates HDD read/write activity | |
| LED - Off | Indicates no data transferring | ||
| PWR LED | LED - Green | Power on indicator | |
| LED - Red (blinking) | Indicates hardware monitor abnormality (contact Progress Kemp Customer Support) | ||
| LED - Off | Power off indicator | ||
| 3. | USB-C type Console Port | Used to connect console devices with USB-C type connection |
Used to connect console |
| 4. | Reset | Reset the LoadMaster | Software reset |
| 5. | HDMI connector | High-Definition Multimedia Interface | Used to connect a HD monitor |
| 6. | USB ports | USB 3.0 ports (x2) | Allows USB devices to connect to the system |
| 7. | 25 Gb Fibre SFP28 ports | 25 Gb Fibre SFP28 ports (x4) | Requires SFP28 transceiver modules (purchase from
Progress Kemp) Logical Assignment Port 4:7 map to ETH4:ETH7 |
| Activity LED - Blinking | Indicates network activity | ||
| Activity LED - Off | Indicates no network activity | ||
| Link LED - On | Link - Continuously illuminated | ||
| Link LED - Off | No link (cable disconnected) | ||
| 8. | 10 Gb Fibre SFP+ Ports | 10 Gbps Fibre SFP+ Ports (x4) | Requires SFP+ modules (purchase from Progress Kemp) Logical Assignment Port 8:11 map to ETH8:ETH11 |
| Activity LED - Blinking | Indicates network activity | ||
| Activity LED - Off | Indicates no network activity | ||
| Link LED - On | Link - Continuously illuminated | ||
| Link LED - Off | No link (cable disconnected) | ||
| 9. | 1 Gb Ethernet Ports | 1 GbE Copper (RJ-45) Ports (x4) | Logical Assignment Port 0:3 map to ETH0:ETH3 |
| Activity LED - Blinking | Indicates network activity | ||
| Activity LED - Off | Indicates no network activity | ||
| Link LED - On | Link - Continuously illuminated | ||
| Link LED - Off | No link (cable disconnected) |
Port Location - Rear Panel
| Item No. | Item | Description | Notes |
|---|---|---|---|
| 10. | Power switch | On/off switch | Press to power on or hold until the device powers off |
| 11. | Dual Hot-Swap Power Supply | 550W 1+1 redundant power supply | Contact Progress Kemp Customer Support before removing Power Supplies |
| LED - Green | Indicates power on mode | ||
| LED - Blinking green | Indicates standby mode | ||
| LED - Blinking Red with high pitch sound | Indicates loss of power supply redundancy and/or issue with power supply |