LoadMaster LM XHC 40G
- Last Updated: March 11, 2025
- 1 minute read
- LoadMaster
- LoadMaster GA
- Documentation
Port Location - Front Panel
| Item No. | Item | Description | Notes |
|---|---|---|---|
| 1. | RAID (Dual HDD) | RAID 1 (mirroring) Hot-Swap Disk (x2) | Disk mirroring - replicating of data to two or more disks |
| HDD LED - Green | Indicates HDD operating normal | ||
| HDD LED - Red | Indicates possible HDD issue (contact Progress Kemp Customer Support) | ||
| Rebuild LED - Blinking amber | Indicates HDD rebuilding process (could take several hours to complete) | ||
| 2. | ERR LED | Error LED - Red | Indicates that the system is experiencing an error during operation (contact Progress Kemp Customer Support) |
| STBY LED | Standby LED - Amber | Indicates that the system is on | |
| HDD LED | LED - Amber | Indicates HDD activity | |
|
LED - Off |
Indicates no HDD activity | ||
| PWR LED | LED - Green | Power on indicator | |
| LED - Off | Power off indicator | ||
| 3. | Console port | Console connection | Allows console devices to connect to the system |
| 4. | USB ports | USB 3.0 ports (x2) | Allows USB devices to connect to the system |
| 5. | 1 Gb Ethernet ports | 1 GbE copper (RJ45) ports (x2) |
Logical Assignment Port 0:1 map to ETH0:ETH1 |
| Activity LED - Blinking | Indicates network activity | ||
| Activity LED - Off | Indicates no network activity | ||
| Link LED - On | Link - connection established | ||
| Link LED - Off | No link (cable disconnected) | ||
| 6. | Reset | Reset LoadMaster |
System reset |
| 7. | 10 Gb Fibre SFP+ ports | 10 Gbps SFP+ ports (x8) |
Requires SFP+ transceiver modules (purchase from Progress Kemp) Logical Assignment Port 2:9 map to ETH2:ETH9 |
| Activity LED - Blinking | Indicates network activity | ||
| Activity LED - Off | Indicates no network activity | ||
| Link LED - On | Link - connection established | ||
| Link LED - Off | No link (cable disconnected) | ||
| 8. | 40 Gb Fibre QSFP+ ports | 40 Gb Fibre QSFP+ Ports (x4) |
Requires QSFP+ transceiver modules (purchase from Progress Kemp) Logical Assignment Port 10:13 map to ETH10:ETH13 |
| Activity LED - Blinking | Indicates network activity | ||
| Activity LED - Off | Indicates no network activity | ||
| Link LED - On | Link - connection established | ||
| Link LED - Off | No link (cable disconnected) |
Port Location - Real Panel
| Item No. | Item | Description | Notes |
|---|---|---|---|
| 9. | VGA port | Standard VGA interface | Used to connect a VGA monitor |
| 10. | Power switch | On/off switch | Press to power on or hold until the device powers off |
| 11. | USB ports | USB 2.0 ports (x2) | Allows USB devices to connect to the system |
| 12. | Dual Hot-Swap Power Supply | 700W 1+1 redundant power supply | Power source for the system. Refer to row 2 in the table above for LED status indicators. |
| LED - Green | Indicates power on mode | ||
| LED - Blinking green | Indicates standby mode | ||
| LED - Amber | Indicates loss of power supply redundancy and/or issue with power supply |