Skip to main contentSkip to search
Powered by Zoomin Software. For more details please contactZoomin
Progress DocumentationProgress Documentation
Progress Documentation
  • Home
  • Home
  • EnglishČeštinaDeutsch (Germany)Español (Spain)FranzösischItaliano (Italy)Português (Brasil)日本語Русский (Russia)中文 (简体) (China)中文 (繁體, 台灣) (Taiwan)ar-AR
  • Login

Progress DataDirect Hybrid Data Pipeline Best Practices Guide Release 5.0.0

Upgrading the test environment followed by upgrade of the production environment

Save PDF
Save selected topicSave selected topic and subtopicsSave all topics
Share
Share to emailCopy topic URL
Print
Table of Contents
  • Progress DataDirect Hybrid Data Pipeline Best Practices Guide
    • Product documentation resources
  • Backing up Hybrid Data Pipeline deployments
    • Backing up a load balancer deployment
    • Backing up a non-load balancer deployment
  • Configuring system database failover
    • Configuring system database failover during installation
    • Configuring system database failover during upgrade
    • The AlternateServers connection property
  • Planning for growth
    • Adding nodes to the load balancer deployment
  • Upgrading load balancer deployments
    • Upgrading the test environment followed by upgrade of the production environment
      • Upgrading the test environment
      • Upgrading the production environment
    • Cloning and upgrading a deployment followed by updating the DNS
      • Creating a clone of the production environment
      • Upgrading the cloned environment and updating the DNS
    • Rolling back to previous version if upgrade fails
  • Replacing a load balancer
  • Recovering nodes running behind a load balancer
    • Replacing a failed node behind a network load balancer
  • Recovering an external system database
    • Modify settings upgrade for system database recovery
    • Express upgrade system database recovery
  • Disaster recovery for a network load balancer deployment
    • Recovering from complete system failure
  • Security best practices
    • Updating SSL certificates
    • Working with remote file locations
  • Legal Notices
    • Copyright
Table of Contents

Upgrading the test environment followed by upgrade of the production environment

Save PDF
Save selected topicSave selected topic and subtopicsSave all topics
Share
Share to emailCopy topic URL
Print
  • Last Updated: September 9, 2022
  • 1 minute read
    • Hybrid Data Pipeline
    • Version 5.0
    • Documentation

Upgrading the test environment followed by upgrade of the production environment

When separate test and production environments are available, we recommend an upgrade of the test environment, followed by an upgrade of the production environment.

Contents
  • Upgrading the test environment
  • Upgrading the production environment
TitleResults for “How to create a CRG?”Also Available inAlert