The LoadMaster must be configured to drop connections on Real Server failure in order to have fast failover for clients to another Real Server. To enable this setting, follow the steps below:

  1. In the main menu, select System Configuration.
  2. Select Miscellaneous Options.
  3. Select L7 Configuration.
  4. Select the Drop Connections on RS failure check box.