On-prem to On-prem
- Last Updated: September 10, 2024
- 1 minute read
- LoadMaster
- LoadMaster GA
- Documentation
Refer to the network diagram below for an example on-prem to on-prem scenario.

The above diagram could apply to the following setups (depending on the
GEO configuration and your environment/topology):
- Active/Active site setup
- Active/Disaster Recovery (DR) site setup
- GEO location/proximity scheduling method setup