Failback processing using controlled transition
- Last Updated: January 17, 2024
- 2 minute read
- OpenEdge
- Version 12.8
- Documentation
When secondary replication is being performed, as shown in the following figure, both databases are up and running and all secondary transactions are being replicated to the primary database.

At this point, the secondary is considered the production database and the primary is considered the replica.
While secondary replication is occurring and the Replication server and agent are actively performing Replication, you must determine when the best time is to fail back production processing to the primary computer.
The following figure illustrates the scheduling of database downtime.

When you begin failback processing, it is critical that no users be connected to either the primary or the secondary database. Both databases must be shut down to transition them.
It is recommended that the transition configuration for both the primary and the secondary databases be checked and modified if needed at this time.