Powered by Zoomin Software. For more details please contactZoomin

Flowmon Pre Installation Manual

Prerequisites

  • Last Updated: May 27, 2026
  • 1 minute read
    • Flowmon Products
    • Flowmon
    • Documentation

This guide describes the requirements for Flowmon appliance deployment:

  • Configuration of switches/routers (depending on the deployment of the Probe/Collector)

    • Depending on the planned deployment of the Flowmon solution you may need to configure the following:

      • SPAN/mirror port of switch/router to monitor traffic going through the device

      • NetFlow data export to the Collector

    • Notice: we strongly recommend ensuring the availability of the network administrator who is responsible for the configuration of switches/routers

  • Prepare the switch/router ports for management ports of Probes/Collectors connection to the LAN

  • Place in the rack

    • 1U for each probe and collector models 1000 – 6000Pro

    • 2U for each probe 40 000Pro

    • 2U for each collector 12 000Pro

    • 1U for up to 3 rack TAPs

  • Power (we recommend the backup power supply from the UPS)

    • 1x 110/230V for each probe and non-Pro collector (1000 and 2000)

    • 2x 110/230V for each probe 20 000Pro, 40 000 and 40 000Pro

    • 2x 110/230V for each Pro collector (3000Pro and higher)

    • 1x 110/230V for copper TAP (has its own power adapter including power cable)

  • Network cables (copper or optical as needed)

    • Probe

      • 1x cable for management port (copper, RJ45)

      • 1x cable for each monitoring port

(Note: 1 SPAN port needs 1 monitoring port of the Probe, TAP needs 2 monitoring ports of the Probe)

  • Collector

    • 1x cable for management port (copper, RJ45)
  • TAP

    • 1x short cable between TAP and switch/router
TitleResults for “How to create a CRG?”Also Available inAlert