Skip to main contentSkip to search
Powered by Zoomin Software. For more details please contactZoomin
Progress DocumentationProgress Documentation
Progress Documentation
  • Home
  • Home
  • EnglishČeštinaDeutsch (Germany)Español (Spain)Français (France)Italiano (Italy)Português (Brasil)日本語Русский (Russia)中文 (简体) (China)中文 (繁體, 台灣) (Taiwan)ar-AR
  • Login

Installation Guide Progress® Connection Manager for ObjectScale

Installing a Hardware Connection Manager

Save PDF
Save selected topicSave selected topic and subtopicsSave all topics
Share
Share to emailCopy topic URL
Print
Table of Contents
  • Introduction
    • Document Purpose
    • Prerequisites
  • Installing a Hardware Connection Manager
    • Connect and Power On the Equipment
    • Configure Networking
    • License and Configure the Connection Manager
Table of Contents

Installing a Hardware Connection Manager

Save PDF
Save selected topicSave selected topic and subtopicsSave all topics
Share
Share to emailCopy topic URL
Print
  • Last Updated: August 6, 2025
  • 1 minute read
    • Progress Connection Manager for ObjectScale
    • Documentation

A hardware Connection Manager package includes the following items:

  • Hardware Connection Manager appliance
  • Power cable
  • Serial cable
  • Mounting brackets
Contents
  • Connect and Power On the Equipment
  • Configure Networking
  • License and Configure the Connection Manager
TitleResults for “How to create a CRG?”Also Available inAlert