The following prerequisites are needed:

  • A Fujitsu Primergy server

  • A CD with the LoadMaster software.

Note: The ISO image can be downloaded from www.kemptechnologies.com/baremetal-trial.
  • For a standalone LoadMaster, one IP-address on an untagged LAN is required. Three IP-addresses are required for a High Availability (HA) pair.

  • A USB CD-ROM drive, or one built in to the server

  • A USB keyboard and VGA monitor

  • The boot order on the server should be configured as follows:

  1. CDROM
  2. HDD

For instructions on how to configure the boot order, refer to the following page: Configuring BIOS Settings of Managed Servers.